A fully coupled hydro-thermo-poro-mechanical model for black oil reservoir simulation

Pao, William K. S. and Lewis, Roland W. and Masters, Ian (2001) A fully coupled hydro-thermo-poro-mechanical model for black oil reservoir simulation. INTERNATIONAL JOURNAL FOR NUMERICAL AND ANALYTICAL METHODS IN GEOMECHANICS, 25. pp. 1229-1256. ISSN 0363-9061

[thumbnail of Journal articles] PDF (Journal articles)
IJNAG.pdf - Published Version
Restricted to Registered users only

Download (1MB)

Abstract

Afully coupled formulation of a hydro-thermo-poro-mechanical model for a three-phase black oil reservoir
model is presented. The model is based upon the approach proposed by one of the authors which fully
couples geomechanical e!ects to multiphase #ow. Their work is extended here to include non-isothermal
e!ects. The gas phase contribution to the energy equation has been neglected based on a set of assumptions.
The coupled formulation given herein di!ers in several ways when compared to the earlier work and an
attempt is made to link the #ow based formulation and mixture theory. The Finite Element Method is
employed for the numerical treatment and essential algorithmic implementation is discussed. Numerical
examples are presented to provide further understanding of the current methodology.

Item Type: Article
Impact Factor: 1.167
Subjects: T Technology > TJ Mechanical engineering and machinery
T Technology > TN Mining engineering. Metallurgy
Departments / MOR / COE: Departments > Mechanical Engineering
Depositing User: Dr William Pao
Date Deposited: 26 Sep 2011 09:36
Last Modified: 20 Mar 2017 01:57
URI: http://scholars.utp.edu.my/id/eprint/6447

Actions (login required)

View Item
View Item