Computer Tool For Estimating Project Cost Contigency Based On Risk Analysis And Fuzzy Expert System

Rohman, M.Arif and Idrus, Arazi and Nuruddin, F (2008) Computer Tool For Estimating Project Cost Contigency Based On Risk Analysis And Fuzzy Expert System. In: International Conference on Project Management (ICPoM 2008), 18-20 November 2008, Kuala Lumpur.

[thumbnail of ICPoM_Arif.pdf] PDF
ICPoM_Arif.pdf - Published Version
Restricted to Registered users only

Download (1MB)

Abstract

Determination of the appropriate project cost contigency is very important to the success of oproject management. Several methods in estimating project cost contigency have been presented. However, most of the methoids rely on statistical analysis which requires large amount of statistical data that sometimes is not easy to be obtained in the construction industry. This paper presents a methodology and computer tool to estimate cost contigency using a flexible and rational approach based on risk analysis and fuzzy expert system. This model accommodates the use of contractor’s experience and judgment in the analysis process. The optimum model can be used for estimating project cost contigency.

Item Type: Conference or Workshop Item (Paper)
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
Q Science > QA Mathematics > QA76 Computer software
Departments / MOR / COE: Departments > Civil Engineering
Depositing User: AP Ir. Dr. Arazi Idrus
Date Deposited: 07 Apr 2011 09:23
Last Modified: 19 Jan 2017 08:26
URI: http://scholars.utp.edu.my/id/eprint/5397

Actions (login required)

View Item
View Item