Items where Author is "C.T, Ramanathan"
C.T, Ramanathan and Sambu Potty, Narayanan (2014) Qualitative analysis of Time delay and Cost overrun in Multiple Design and Build Projects. In: 2014 ICDMCME 2014 conference, February 4 - 5, 2014, Bali. (Submitted)
Sambu Potty, Narayanan and Idrus, Arazi and C.T, Ramanathan (2012) Analysis of time and cost overrun in Malaysian construction. [Citation Index Journal]
C.T, Ramanathan and Sambu Potty, Narayanan and Idrus, Arazi (2012) Construction delays causing risks on time and cost - a critical review. [Citation Index Journal]
Sambu Potty, Narayanan and Idrus, Arazi and C.T, Ramanathan (2011) Case study and Survey on Time and Cost overrun of Multiple D&B Projects. In: National Postgraduate Conference: Energy and Sustainability, 19 - 20 September 2011, UTP Malaysia.
C.T, Ramanathan and Sambu Potty, Narayanan and Idrus, Arazi (2011) STEEL FABRICATION OF I-BEAMS AND ARCHES IN BRIDGE CONSTRUCTION: A CASE STUDY IN SABAH MALAYSIA. In: 7th International Conference on Steel & Aluminium Structures, 13th –15th July 2011, Kuching, Sarawak, Malaysia.
C.T, Ramanathan and Sambu Potty, Narayanan and B. Idrus, Arazi (2011) Approaches in management of Construction delays and cost overrun of Multiple D&B Projects in Sabah. In: 6th International Conference on Construction in the 21st Century (CITC-VI), July 5-7, 2011, Kuala Lumpur.
Sambu Potty, Narayanan and Idrus, Arazi and C.T, Ramanathan (2011) MANAGING RISK CONSTRAINTS OF MULTIPLE DESIGN & BUILD PROJECTS. In: INTERNATIONAL BUILDING AND INFRASTRUCTURE TECHNOLOGY CONFERENCE 2011, JUNE 7 – 8, 2011, VISTANA HOTEL PENANG.
B. Idrus, Arazi and Sambu Potty, Narayanan and C.T, Ramanathan (2011) Review on Uncertainties Causing Time and Cost Overrun in Construction Projects. WASET, Bangkok, Thailand.
C.T, Ramanathan and Sambu Potty, Narayanan and Idrus, Arazi (2011) Risk factors influencing time and cost overrun in multiple D&B projects in Malaysia: A case study. In: Industrial Engineering and Engineering Management (IEEM), 2011 IEEE International Conference, 6-9 December 2011 , Singapore.
C.T, Ramanathan and Sambu Potty, Narayanan and Idrus, Arazi (2010) CONSTRUCTION OF MULTIPLE DESIGN AND BUILD BRIDGE PROJECTS IN SABAH. In: World Engineering Congress 2010, 2-5 August 2010, Kuching. Sarawak.
Sambu Potty, Narayanan and C.T, Ramanathan and Idrus, Arazi (2010) SUSTAINABLE MANAGEMENT OF MULTIPLE D&B INFRASTRUCTURE PROJECTS IN RURAL AREAS OF SABAH. In: International Conference on Sustainable Building and Infrastructure (ICSBI2010), 15 - 17 June 2010, Kuala Lumpur, Malaysia.
C.T, Ramanathan and Sambu Potty, Narayanan and M. Taharin, Radzif (2010) PROCUREMENT OF BEAMS IN MULTIPLE D&B BRIDGE PROJECTS. [Citation Index Journal]
C.T, Ramanathan and Sambu Potty, Narayanan and Idrus, Arazi (2010) Component Optimisation of Multiple D&B Bridge Projects: A Case Study in Sabah, Malaysia. In: International Conference On Civil And Environmental Engineering ICCEE 2009, October 28 - October 30, Venice Italy.
C.T, Ramanathan and S.P. , Narayanan and B. Idrus, Arazi (2010) Component Optimisation of Multiple D&B Bridge Projects: A Case Study in Sabah, Malaysia. [Citation Index Journal]
C.T, Ramanathan and Sambu Potty, Narayanan (2009) Management Of Multiple Projects In Pre-Design And Pre-Construction Phase. In: 2nd Construction Industry Research Achievement International Conference 2009 (CIRIAC 2009), 3rd November - 5 November 2009, CIDB Convention Centre, Jalan Cheras, Kuala Lumpur.
Sambu Potty, Narayanan and C.T, Ramanathan and Idrus, Arazi (2009) MANAGEMENT OF CRITICAL SPECIALIST WORKS IN MULTIPLE BRIDGE PROJECTS: A CASE STUDY. In: 8th Annual Conference : Management in Construction Researchers Association (MICRA 2009), 9 - 10 June 2009, Universiti Sains Malaysia, Penang.
Sambu Potty, Narayanan and C.T, Ramanathan (2008) Element optimisation techniques in multiple DB bridge projects. [Non-Citation Index Journal]
C.T, Ramanathan and Sambu Potty, Narayanan and M. Taharin, Radzif (2008) ELEMENT OPTIMISATION TECHNIQUES TO MANAGE MULTIPLE DB BRIDGE PROJECTS IN EAST MALAYSIA. In: International Conference on Construction and Building Technology (ICCBT), June 16 - 20, 2008, Kuala Lumpur, Malaysia.
C.T, Ramanathan and Sambu Potty, Narayanan and M. R, Taharin (2008) Complexity in Management of Planning and Control in Multiple Projects. In: Proceedings of the First Seminar on Engineering and Information Technology, April 14-15, 2008, Kota Kinabalu, Sabah, Malaysia.
C.T, Ramanathan and Sambu Potty, Narayanan and M. Taharin, Radzif (2007) Multiple Infrastructure D&B Project Management in Rural Areas in Malaysia. In: World Congress on Urban Infrastructure in Developing Countries, 12-14 November 2007, New Delhi India.
C.T, Ramanathan and Sambu Potty, Narayanan and M. Taharin, Radzif (2007) TEAM BUILDING AND COORDINATION FOR DESIGN -BUILD MULTIPLE PROJECTS. National Conference 2007. pp. 1-7.