Narayanan Sambu Potty and Arazi Bin Idrus (2012) Analysis of time and cost overrun in Malaysian construction. [Citation Index Journal]
Full text not available from this repository.Item Type: | Citation Index Journal |
---|---|
Depositing User: | Ms Sharifah Fahimah Saiyed Yeop |
Date Deposited: | 19 Mar 2013 06:23 |
Last Modified: | 07 Apr 2013 01:56 |
URI: | http://scholars.utp.edu.my/id/eprint/9120 |