SUSTAINABLE CONSTRUCTION PRACTICE: A REVIEW OF CHANGE ORDERS (CO) IN CONSTRUCTION PROJECTS

Wan Abdullah Zawawi, Noor Amila and Nik Azman, Nik Fatin Izyan and Shamsul Kamar, Muhamad Shamil (2010) SUSTAINABLE CONSTRUCTION PRACTICE: A REVIEW OF CHANGE ORDERS (CO) IN CONSTRUCTION PROJECTS. In: International Conference on Environment 2010 , 13th to 15th December 2010, Pulau Pinang.

[thumbnail of Noor Amila ICENV2010] PDF (Noor Amila ICENV2010)
Noor_amila_ICENV2010.pdf - Published Version
Restricted to Registered users only

Download (33MB)

Abstract

Change order is a common phenomenon in any project in Malaysian construction industry. A change order is work that is added to or deleted from the original scope of work of a contract, which alters the original contract amount or completion date. Regardless of its causes, change order often resulted in disputes and dissatisfactions among the parties involved, project delay and difficult to manage due to additional costs. The impacts affect all players in construction projects. The objective of this study is to determine the main causes, effects of change orders in construction and to recommend control measures to minimize the impact from change orders. Literature review and a questionnaire survey targeted at building construction projects in Malaysia have been used as a tool to carry out this study. In this study, the findings obtained from the questionnaire will be the overall result for this study. However, considering that this is the preliminary studies, the results gained are from the literature review. A literature search is made through previous case studies and literature reviews to collect all available information on the causes, effects and controls of change orders. The similarities and the differences of cases from each construction projects are compared and concluded as the outcomes of this case study. At the end of this study, it is hoped that these findings will guide the efforts towards a sustainable practice in the construction industry in Malaysia. This paper also explores and provides some guidelines and actionable information which can be used to improve the construction process.

Item Type: Conference or Workshop Item (Poster)
Uncontrolled Keywords: change orders, construction, review
Subjects: T Technology > TH Building construction
T Technology > TA Engineering (General). Civil engineering (General)
Departments / MOR / COE: Departments > Civil Engineering
Research Institutes > Institute for Sustainable Building
Depositing User: AP Dr Noor Amila Wan Abdullah Zawawi
Date Deposited: 07 Jan 2011 09:15
Last Modified: 19 Jan 2017 08:23
URI: http://scholars.utp.edu.my/id/eprint/3885

Actions (login required)

View Item
View Item